ITAC Assessment: MI0107
ITAC logo
ITAC Assessment: MI0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Vitamin Capsules
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 50,000
ft2
Annual Production 3,500,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,624 3,000,480
kWh
Electricity Demand $41,594 5,176
kW-mo/yr
Electricity Fees $14,886 -
Natural Gas $98,021 9,159
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,990

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $5,544 $600 - - $5,544
02 3.4116: Meter recycled water (to reduce sewer charges) $3,756 $4,360 - - $3,756
03 2.7111: Reduce illumination to minimum necessary levels $3,525 $100 $3,525
67,012
kWh
- -
04 2.4322: Use or replace with energy efficient substitutes $4,012 $4,012 - $4,012
-
MMBtu
-
05 2.7221: Lower temperature during the winter season and vice-versa $2,325 $42 $2,325
44,006
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,128 - $1,128
17,546
kWh
- -
TOTAL RECOMMENDED $20,290 $9,114 $6,978
128,564
kWh
$4,012
-
MMBtu
$9,300
TOTAL IMPLEMENTED $10,990 $4,154 $6,978
128,564
kWh
$4,012
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs