ITAC Assessment: OK0267
ITAC logo
ITAC Assessment: OK0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FROZEN CHICKEN PIECES
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $50
M
to 100
M
# of Employees 1,000
Plant Area
n/a
Annual Production 150,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $833,170 23,448,125
kWh
Natural Gas $288,964 103,963
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,382 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,715

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,200 $1,575 $4,200
143,904
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,960 $2,787 $1,960
67,116
kWh
-
03 2.2122: Install / repair insulation on condensate lines $642 $184 - $642
-
MMBtu
04 2.2511: Insulate bare equipment $728 $312 - $728
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $2,028 $2,050 - $2,028
-
MMBtu
06 2.2515: Use optimum thickness insulation $761 $1,380 $761
32,239
kWh
-
07 2.2135: Repair and eliminate steam leaks $4,601 $300 - $4,601
-
MMBtu
08 2.4322: Use or replace with energy efficient substitutes $11,976 $405 $(-120.0)
(-4,103)
kWh
$12,096
-
MMBtu
09 2.4133: Use most efficient type of electric motors $1,819 $2,370 $1,819
55,686
kWh
-
10 2.2449: Recover heat from exhausted steam, hot air or hot water $7,667 $5,510 - $7,667
-
MMBtu
TOTAL RECOMMENDED $36,382 $16,873 $8,620
294,842
kWh
$27,762
-
MMBtu
TOTAL IMPLEMENTED $28,715 $11,363 $8,620
294,842
kWh
$20,095
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs