ITAC Assessment: UU0064
ITAC logo
ITAC Assessment: UU0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product minerals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 200,000
ft2
Annual Production 4,700,000
lb
Production Hrs. Annual 4,212
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,407 1,637,040
kWh
Electricity Demand $47,507 5,865
kW-mo/yr
Electricity Fees $13,947 -
Natural Gas $111,955 20,683
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,245 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,393

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $14,228 $70,000 $(-821.0)
(-25,311)
kWh
$(-757.0)
-
kW-mo/yr
$15,806
-
MMBtu
-
02 2.1321: Replace fossil fuel equipment with electrical equipment $2,876 $2,255 $(-2,281.0)
(-73,440)
kWh
$(-1,022.0)
-
kW-mo/yr
$6,179
-
MMBtu
-
03 2.4239: Eliminate or reduce compressed air usage $2,624 $2,400 $125
3,851
kWh
$2,499
-
kW-mo/yr
- -
04 2.2437: Recover waste heat from equipment $1,252 $1,754 - - $1,252
-
MMBtu
-
05 2.6218: Turn off equipment when not in use $1,785 - $869
26,835
kWh
$916
-
kW-mo/yr
- -
06 2.8114: Change rate schedules or other changes in utility service $5,480 - - - - $5,480
TOTAL RECOMMENDED $28,245 $76,409 $(-2,108.0)
(-68,065)
kWh
$1,636
-
kW-mo/yr
$23,237
-
MMBtu
$5,480
TOTAL IMPLEMENTED $11,393 $4,009 $(-1,412.0)
(-46,605)
kWh
$(-106.0)
-
kW-mo/yr
$7,431
-
MMBtu
$5,480
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs