Assessment Year | 1987 |
---|---|
Principal Product | PACKAGED SEAFOOD |
NAICS |
n/a
|
SIC | 2092: Prepared Fresh or Frozen Fish and Seafoods |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
n/a
|
Annual Production | 11,200,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $93,594 | 1,832,943 |
kWh
|
$0.051 |
Natural Gas | $34,818 | 5,780 |
MMBtu
|
$6.02 |
Fuel Oil #2 | $3,334 | 952 |
MMBtu
|
$3.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,687 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,442 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $10,322 | - |
$10,322
202,227
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $377 | - |
$377
7,327
kWh
|
- | - | |
03 | 2.6232: Install set-back timers | $830 | $31 |
$560
10,844
kWh
|
- | $270 | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $890 | $300 | - |
$890
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,770 | $2,816 |
$2,781
54,220
kWh
|
- | $2,989 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $246 | - |
$528
10,258
kWh
|
- | $(-282.0) | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $83 | - |
$757
14,947
kWh
|
- | $(-674.0) | |
08 | 2.4133: Use most efficient type of electric motors | $169 | $172 |
$169
3,224
kWh
|
- | - | |
TOTAL RECOMMENDED | $18,687 | $3,319 |
$15,494
303,047
kWh
|
$890
-
MMBtu
|
$2,303 | ||
TOTAL IMPLEMENTED | $17,442 | $3,116 |
$14,237
278,721
kWh
|
$890
-
MMBtu
|
$2,315 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs