ITAC Assessment: OR0014
ITAC logo
ITAC Assessment: OR0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PACKAGED SEAFOOD
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area
n/a
Annual Production 11,200,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,594 1,832,943
kWh
Natural Gas $34,818 5,780
MMBtu
Fuel Oil #2 $3,334 952
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,687 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $10,322 - $10,322
202,227
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $377 - $377
7,327
kWh
- -
03 2.6232: Install set-back timers $830 $31 $560
10,844
kWh
- $270
04 2.1233: Analyze flue gas for proper air/fuel ratio $890 $300 - $890
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,770 $2,816 $2,781
54,220
kWh
- $2,989
06 2.7142: Utilize higher efficiency lamps and/or ballasts $246 - $528
10,258
kWh
- $(-282.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $83 - $757
14,947
kWh
- $(-674.0)
08 2.4133: Use most efficient type of electric motors $169 $172 $169
3,224
kWh
- -
TOTAL RECOMMENDED $18,687 $3,319 $15,494
303,047
kWh
$890
-
MMBtu
$2,303
TOTAL IMPLEMENTED $17,442 $3,116 $14,237
278,721
kWh
$890
-
MMBtu
$2,315
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs