ITAC Assessment: OR0642
ITAC logo
ITAC Assessment: OR0642
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Asphalt Shingles
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $100
M
to 500
M
# of Employees 87
Plant Area 100,599
ft2
Annual Production 1,400,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $303,453 4,394,684
kWh
Electricity Demand $42,693 10,207
kW-mo/yr
Electricity Fees $23,279 -
Natural Gas $209,473 36,597
MMBtu
LPG $42,000 2,263
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $141,300 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,835

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 4.454: Modify startup/shutdown times $6,091 $44,052 $6,091
86,688
kWh
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,013 $24,232 $14,841
211,231
kWh
$1,172
-
kW-mo/yr
- - - -
03 2.8227: Adjust / maintain fork lift trucks for most efficient operation $46,293 $100,000 $(-14,610.0)
(-207,941)
kWh
$(-9,717.0)
-
kW-mo/yr
- $42,000
-
MMBtu
- $28,620
04 2.7243: Improve air circulation with destratification fans / other methods $5,825 $22,383 $5,241
74,588
kWh
$584
-
kW-mo/yr
- - - -
05 2.1133: Adjust burners for efficient operation $1,833 $500 - - $2,333
-
MMBtu
- - $(-500.0)
06 3.6192: Use a less expensive method of waste removal $64,347 $61,077 - - - - $125,424
-
lb
$(-61,077.0)
07 2.2511: Insulate bare equipment $898 $2,015 - - $898
-
MMBtu
- - -
TOTAL RECOMMENDED $141,300 $254,259 $11,563
164,566
kWh
$(-7,961.0)
-
kW-mo/yr
$3,231
-
MMBtu
$42,000
-
MMBtu
$125,424
-
lb
$(-32,957.0)
TOTAL IMPLEMENTED $24,835 $70,799 $20,932
297,919
kWh
$1,172
-
kW-mo/yr
$3,231
-
MMBtu
- - $(-500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs