Assessment Year | 2015 |
---|---|
Principal Product | Asphalt Shingles |
NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $100 M to 500M |
# of Employees | 87 |
Plant Area |
100,599
ft2
|
Annual Production | 1,400,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $303,453 | 4,394,684 |
kWh
|
$0.069 |
Electricity Demand | $42,693 | 10,207 |
kW-mo/yr
|
$4.18 |
Electricity Fees | $23,279 | - |
|
- |
Natural Gas | $209,473 | 36,597 |
MMBtu
|
$5.72 |
LPG | $42,000 | 2,263 |
MMBtu
|
$18.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $141,300 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,835 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.454: Modify startup/shutdown times | $6,091 | $44,052 |
$6,091
86,688
kWh
|
- | - | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,013 | $24,232 |
$14,841
211,231
kWh
|
$1,172
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $46,293 | $100,000 |
$(-14,610.0)
(-207,941)
kWh
|
$(-9,717.0)
-
kW-mo/yr
|
- |
$42,000
-
MMBtu
|
- | $28,620 | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $5,825 | $22,383 |
$5,241
74,588
kWh
|
$584
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.1133: Adjust burners for efficient operation | $1,833 | $500 | - | - |
$2,333
-
MMBtu
|
- | - | $(-500.0) | |
06 | 3.6192: Use a less expensive method of waste removal | $64,347 | $61,077 | - | - | - | - |
$125,424
-
lb
|
$(-61,077.0) | |
07 | 2.2511: Insulate bare equipment | $898 | $2,015 | - | - |
$898
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $141,300 | $254,259 |
$11,563
164,566
kWh
|
$(-7,961.0)
-
kW-mo/yr
|
$3,231
-
MMBtu
|
$42,000
-
MMBtu
|
$125,424
-
lb
|
$(-32,957.0) | ||
TOTAL IMPLEMENTED | $24,835 | $70,799 |
$20,932
297,919
kWh
|
$1,172
-
kW-mo/yr
|
$3,231
-
MMBtu
|
- | - | $(-500.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs