ITAC Assessment: MI0097
ITAC logo
ITAC Assessment: MI0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Pharmaceutical preparation
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 134,047
ft2
Annual Production 363,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $361,529 10,245,600
kWh
Electricity Demand $107,843 17,883
kW-mo/yr
Electricity Fees $94,796 -
Natural Gas $240,280 298,797
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $124,394 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $3,490 $2,100 - - $3,490
02 2.6218: Turn off equipment when not in use $59,412 $800 $59,412
1,000,740
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,212 $52,535 $24,212
508,123
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $5,883 $30 - $5,883
-
MMBtu
-
05 2.7221: Lower temperature during the winter season and vice-versa $3,188 $7,077 $3,188
57,955
kWh
- -
06 2.4226: Use / purchase optimum sized compressor $28,209 $71,500 $28,209
666,701
kWh
- -
TOTAL RECOMMENDED $124,394 $134,042 $115,021
2,233,519
kWh
$5,883
-
MMBtu
$3,490
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs