ITAC Assessment: OK1117
ITAC logo
ITAC Assessment: OK1117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Electronic engine & Motion control assemblies
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $100
M
to 500
M
# of Employees 259
Plant Area 185,000
ft2
Annual Production 2,416,616
pieces
Production Hrs. Annual 5,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $378,967 3,439,760
kWh
Natural Gas $9,697 2,604
MMBtu
Waste Disposal Costs
Water Usage $3,544 1,185
Tgal
Water Disposal $11,931 1,185
Tgal
TOTAL YEARLY COSTS $404,139
RECOMMENDED SAVINGS* $90,304 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $196 $563 $196
1,778
kWh
-
02 2.6211: Conserve energy by efficient use of vending machines $378 $178 $378
3,440
kWh
-
03 2.9114: Use solar heat to make electricty $56,512 $327,600 $56,512
513,743
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,975 $5,473 $7,975
72,504
kWh
-
05 2.7491: Insulate glazing, walls, ceilings, and roofs $13,497 $142,202 $9,252
84,102
kWh
$4,245
-
MMBtu
06 2.7211: Clean and maintain refrigerant condensers and towers $8,042 $13,524 $8,042
73,106
kWh
-
07 2.7232: Replace existing hvac unit with high efficiency model $2,757 $7,700 $2,757
25,062
kWh
-
08 2.6218: Turn off equipment when not in use $947 - $947
8,610
kWh
-
TOTAL RECOMMENDED $90,304 $497,240 $86,059
782,345
kWh
$4,245
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs