Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

358

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Softwood veneer and plywood
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0827 #07 Y:2026 Use solar heat to make electricty $34,776 $600,754
OR0827 #06 Y:2026 Optimize plant power factor $7,574 $55,435
OR0827 #05 Y:2026 Cover open tanks $1,065 $184
OR0827 #04 Y:2026 Recover waste heat from equipment $78,209 $1,612
OR0827 #03 Y:2026 Use optimum size and capacity equipment $2,712,540 $32,000
OR0827 #02 Y:2026 Utilize energy-efficient belts and other improved mechanisms $2,685 -
OR0827 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $6,835 -
UW2602 #06 Y:2026 Optimize plant power factor $61,576 $37,084
UW2602 #05 Y:2026 Repair and eliminate steam leaks $38,800 $7,287
UW2602 #04 Y:2026 Use or replace with energy efficient substitutes $10,764 $32,940
UW2602 #03 Y:2026 Install occupancy sensors $20,293 $15,688
UW2602 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $6,269 $7,520
UW2602 #01 Y:2026 Burn wood by-products for heat $362,644 $6,038,074
OR0761 #04 Y:2022 Modify facility to avoid excess maintenance costs $31,013 $150,000
OR0761 #03 Y:2022 Optimize plant power factor $6,236 $26,406
OR0761 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $9,934 $9,934
OR0761 #01 Y:2022 Reduce the pressure of compressed air to the minimum required $1,913 $1,078
UA0260 #06 Y:2022 Utilize energy-efficient belts and other improved mechanisms $5,000 $1,784
UA0260 #05 Y:2022 Optimize plant power factor $90,617 $35,347
UA0260 #04 Y:2022 Preheat combustion air with waste heat $230,787 $328,350