ITAC Assessment: OR0727
ITAC logo
ITAC Assessment: OR0727
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Softwood Veneer
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 1,304,000
ft2
Annual Production 310,000
units
Production Hrs. Annual 6,120
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $425,056 8,004,215
kWh
Electricity Demand $194,359 22,064
kW-mo/yr
Electricity Fees $70,222 -
Natural Gas $463,541 90,745
MMBtu
Fuel Oil #1 $106,190 4,865
MMBtu
Waste Disposal Costs
Water Usage $34,852 13,097
Tgal
TOTAL YEARLY COSTS $1,294,220
RECOMMENDED SAVINGS* $2,379,640 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,125

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $2,245,906 $300,000 - - - - $23,684 $2,222,222
02 2.8227: Adjust / maintain fork lift trucks for most efficient operation $125,609 $904,500 $(-8,459.0)
(-154,440)
kWh
$(-1,252.0)
-
kW-mo/yr
$106,190
-
MMBtu
$29,130 - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $6,870 $19,006 $5,269
96,208
kWh
$1,601
-
kW-mo/yr
- - - -
04 2.4322: Use or replace with energy efficient substitutes $1,255 $770 $1,255
22,910
kWh
- - - - -
TOTAL RECOMMENDED $2,379,640 $1,224,276 $(-1,935.0)
(-35,322)
kWh
$349
-
kW-mo/yr
$106,190
-
MMBtu
$29,130 $23,684 $2,222,222
TOTAL IMPLEMENTED $8,125 $19,776 $6,524
119,118
kWh
$1,601
-
kW-mo/yr
- - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs