Assessment Year | 2019 |
---|---|
Principal Product | Softwood Veneer |
NAICS | 321212: Softwood Veneer and Plywood Manufacturing |
SIC | 2436: Softwood Veneer and Plywood |
Sales Range | $50 M to 100M |
# of Employees | 60 |
Plant Area |
1,304,000
ft2
|
Annual Production | 310,000
units
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $425,056 | 8,004,215 |
kWh
|
$0.053 | |
Electricity Demand | $194,359 | 22,064 |
kW-mo/yr
|
$8.81 | |
Electricity Fees | $70,222 | - |
|
- | |
Natural Gas | $463,541 | 90,745 |
MMBtu
|
$5.11 | |
Fuel Oil #1 | $106,190 | 4,865 |
MMBtu
|
$21.83 | |
Waste Disposal Costs | |||||
Water Usage | $34,852 | 13,097 |
Tgal
|
$2.66 | |
TOTAL YEARLY COSTS | $1,294,220 | ||||
RECOMMENDED SAVINGS* | $2,379,640 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $8,125 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | Personnel Changes Savings | Administrative Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $2,245,906 | $300,000 | - | - | - | - | $23,684 | $2,222,222 | |
02 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $125,609 | $904,500 |
$(-8,459.0)
(-154,440)
kWh
|
$(-1,252.0)
-
kW-mo/yr
|
$106,190
-
MMBtu
|
$29,130 | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,870 | $19,006 |
$5,269
96,208
kWh
|
$1,601
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4322: Use or replace with energy efficient substitutes | $1,255 | $770 |
$1,255
22,910
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $2,379,640 | $1,224,276 |
$(-1,935.0)
(-35,322)
kWh
|
$349
-
kW-mo/yr
|
$106,190
-
MMBtu
|
$29,130 | $23,684 | $2,222,222 | ||
TOTAL IMPLEMENTED | $8,125 | $19,776 |
$6,524
119,118
kWh
|
$1,601
-
kW-mo/yr
|
- | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs