ITAC Assessment: UA0260
ITAC logo
ITAC Assessment: UA0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Plywood
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 510,000
ft2
Annual Production 1,333,333
units
Production Hrs. Annual 8,400
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,654,999 63,709,884
kWh
Electricity Demand $523,538 101,360
kW-mo/yr
Electricity Fees $158,757 -
Natural Gas $4,659,736 971,793
MMBtu
TOTAL YEARLY COSTS $8,997,030
RECOMMENDED SAVINGS* $779,294 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $94,327

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $19,881 $1,000 $17,415
303,397
kWh
$1,738
-
kW-mo/yr
$728 -
02 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $3,710 $1,651 $3,071
53,506
kWh
$522
-
kW-mo/yr
$117 -
03 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $429,299 $2,825,211 $340,551
5,932,943
kWh
$73,032
-
kW-mo/yr
$15,716 -
04 2.2442: Preheat combustion air with waste heat $230,787 $328,350 - - - $230,787
-
MMBtu
05 2.3212: Optimize plant power factor $90,617 $35,347 - - $90,617 -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,000 $1,784 $3,973
69,228
kWh
$844
-
kW-mo/yr
$183 -
TOTAL RECOMMENDED $779,294 $3,193,343 $365,010
6,359,074
kWh
$76,136
-
kW-mo/yr
$107,361 $230,787
-
MMBtu
TOTAL IMPLEMENTED $94,327 $36,998 $3,071
53,506
kWh
$522
-
kW-mo/yr
$90,734 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs