ITAC Assessment: OR0761
ITAC logo
ITAC Assessment: OR0761
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Short cut stock, long cut stock, wood moldings, wood veneer
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 154
Plant Area 486,000
ft2
Annual Production 32,000,000
units
Production Hrs. Annual 6,450
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,753 5,404,640
kWh
Electricity Demand $229,468 21,065
kW-mo/yr
Electricity Fees $59,577 -
Natural Gas $122,560 16,155
MMBtu
TOTAL YEARLY COSTS $654,358
RECOMMENDED SAVINGS* $49,096 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,847

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,913 $1,078 $1,432
20,704
kWh
$481
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,934 $9,934 $7,460
107,792
kWh
$2,474
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $6,236 $26,406 - - $6,236 -
04 4.463: Modify facility to avoid excess maintenance costs $31,013 $150,000 $(-13,732.0)
(-198,406)
kWh
$(-5,655.0)
-
kW-mo/yr
- $50,400
TOTAL RECOMMENDED $49,096 $187,418 $(-4,840.0)
(-69,910)
kWh
$(-2,700.0)
-
kW-mo/yr
$6,236 $50,400
TOTAL IMPLEMENTED $11,847 $11,012 $8,892
128,496
kWh
$2,955
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs