Assessment Year | 2022 |
---|---|
Principal Product | Short cut stock, long cut stock, wood moldings, wood veneer |
NAICS | 321212: Softwood Veneer and Plywood Manufacturing |
SIC | 2436: Softwood Veneer and Plywood |
Sales Range | $10 M to 50M |
# of Employees | 154 |
Plant Area |
486,000
ft2
|
Annual Production | 32,000,000
units
|
Production Hrs. Annual | 6,450
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $242,753 | 5,404,640 |
kWh
|
$0.045 |
Electricity Demand | $229,468 | 21,065 |
kW-mo/yr
|
$10.89 |
Electricity Fees | $59,577 | - |
|
- |
Natural Gas | $122,560 | 16,155 |
MMBtu
|
$7.59 |
TOTAL YEARLY COSTS | $654,358 | |||
RECOMMENDED SAVINGS* | $49,096 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,847 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,913 | $1,078 |
$1,432
20,704
kWh
|
$481
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,934 | $9,934 |
$7,460
107,792
kWh
|
$2,474
-
kW-mo/yr
|
- | - | |
03 | 2.3212: Optimize plant power factor | $6,236 | $26,406 | - | - | $6,236 | - | |
04 | 4.463: Modify facility to avoid excess maintenance costs | $31,013 | $150,000 |
$(-13,732.0)
(-198,406)
kWh
|
$(-5,655.0)
-
kW-mo/yr
|
- | $50,400 | |
TOTAL RECOMMENDED | $49,096 | $187,418 |
$(-4,840.0)
(-69,910)
kWh
|
$(-2,700.0)
-
kW-mo/yr
|
$6,236 | $50,400 | ||
TOTAL IMPLEMENTED | $11,847 | $11,012 |
$8,892
128,496
kWh
|
$2,955
-
kW-mo/yr
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs