ITAC Assessment: AM0219
ITAC logo
ITAC Assessment: AM0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Newspapers
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 205
Plant Area 100,000
ft2
Annual Production 17,465,000
pieces
Production Hrs. Annual 1,820
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,634 3,552,462
kWh
Natural Gas $14,184 3,130
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,584 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,426

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $22,956 $145,710 $33,728
226,260
kWh
$(-10,772.0)
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $960 $2,405 $960
8,499
kWh
- -
03 2.6213: Turn off steam / hot water lines leading to space heating units $550 - - $550
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,510 $1,413 $1,510
58,030
kWh
- -
05 3.5316: Contract a wood pallet recycling company $3,408 - - - $3,408
06 3.8132: Use less toxic and volatile solvent substitutes $5,200 $2,400 - - $5,200
TOTAL RECOMMENDED $34,584 $151,928 $36,198
292,789
kWh
$(-10,222.0)
-
MMBtu
$8,608
TOTAL IMPLEMENTED $25,426 $149,528 $36,198
292,789
kWh
$(-10,772.0)
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs