ITAC Assessment: LM0043
ITAC logo
ITAC Assessment: LM0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product television plastic cabinets
NAICS
n/a
SIC 2519: Household Furniture, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 54,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 8,352
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $365,627 4,206,107
kWh
Electricity Demand $120,809 8,880
kW-mo/yr
Electricity Fees $9,906 -
Natural Gas $358 27
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,908 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,512

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,510 $1,365 $504
5,109
kWh
$1,006
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,494 $2,354 $2,942
27,270
kWh
$552
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,002 $250 $3,221
29,846
kWh
$561
-
kW-mo/yr
- $(-780.0) -
04 2.4133: Use most efficient type of electric motors $2,618 $910 $2,229
20,665
kWh
$389
-
kW-mo/yr
- - -
05 2.4322: Use or replace with energy efficient substitutes $284 $331 $274
2,964
kWh
$56
-
kW-mo/yr
$(-46.0)
-
MMBtu
- -
06 4.122: Develop standard procedures to improve internal yields $27,000 $19,260 - - - - $27,000
TOTAL RECOMMENDED $37,908 $24,470 $9,170
85,854
kWh
$2,564
-
kW-mo/yr
$(-46.0)
-
MMBtu
$(-780.0) $27,000
TOTAL IMPLEMENTED $4,512 $1,615 $3,725
34,955
kWh
$1,567
-
kW-mo/yr
- $(-780.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs