Assessment Year | 2022 |
---|---|
Principal Product | Plywood |
NAICS | 321212: Softwood Veneer and Plywood Manufacturing |
SIC | 2436: Softwood Veneer and Plywood |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
360,000
ft2
|
Annual Production | 1,333,333
units
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,473,143 | 66,298,576 |
kWh
|
$0.037 |
Electricity Demand | $1,256,499 | 102,512 |
kW-mo/yr
|
$12.26 |
Electricity Fees | $114,250 | - |
|
- |
Natural Gas | $275,638 | 52,157 |
MMBtu
|
$5.28 |
Other Energy | $2,990,000 | 943,000 |
MMBtu
|
$3.17 |
TOTAL YEARLY COSTS | $7,109,530 | |||
RECOMMENDED SAVINGS* | $405,607 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $77,909 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Other Energy Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $27,827 | $1,000 |
$17,791
476,975
kWh
|
$9,210
-
kW-mo/yr
|
$826 | - | |
02 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $2,057 | $2,063 |
$1,996
53,506
kWh
|
- | $61 | - | |
03 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $100,047 | $47,295 | - | - | - |
$100,047
-
MMBtu
|
|
04 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $225,594 | $969,631 |
$137,936
3,698,026
kWh
|
$80,960
-
kW-mo/yr
|
$6,698 | - | |
05 | 2.3212: Optimize plant power factor | $50,082 | $26,090 | - | - | $50,082 | - | |
TOTAL RECOMMENDED | $405,607 | $1,046,079 |
$157,723
4,228,507
kWh
|
$90,170
-
kW-mo/yr
|
$57,667 |
$100,047
-
MMBtu
|
||
TOTAL IMPLEMENTED | $77,909 | $27,090 |
$17,791
476,975
kWh
|
$9,210
-
kW-mo/yr
|
$50,908 | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs