64
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Manufactured ice | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
LE0520 #04 Y:2022 | 04 | 2022 | Use most efficient type of electric motors | $7,958 | $50,000 | |
LE0520 #03 Y:2022 | 03 | 2022 | Utilize higher efficiency lamps and/or ballasts | $1,247 | $4,450 | |
LE0520 #02 Y:2022 | 02 | 2022 | Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $9,676 | $23,000 | |
LE0520 #01 Y:2022 | 01 | 2022 | Reduce the pressure of compressed air to the minimum required | $1,006 | $35 | |
OR0734 #04 Y:2020 | 04 | 2020 | Utilize energy-efficient belts and other improved mechanisms | $1,078 | $220 | |
OR0734 #03 Y:2020 | 03 | 2020 | Use closed cycle process to minimize waste water production | $20,357 | $6,830 | |
OR0734 #02 Y:2020 | 02 | 2020 | Install refrigeration system to cool product | $44,429 | $117,388 | |
OR0734 #01 Y:2020 | 01 | 2020 | Increase use of automation | $126,455 | $360,000 | |
AS0454 #06 Y:2018 | 06 | 2018 | Insulate bare equipment | $4,026 | $3,043 | |
AS0454 #05 Y:2018 | 05 | 2018 | Make ice during off peak hours for cooling | $11,530 | $150 | |
AS0454 #04 Y:2018 | 04 | 2018 | Use less wasteful packaging | $12,596 | $196 | |
AS0454 #03 Y:2018 | 03 | 2018 | Utilize higher efficiency lamps and/or ballasts | $13,697 | $12,185 | |
AS0454 #02 Y:2018 | 02 | 2018 | Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $64,677 | - | |
AS0454 #01 Y:2018 | 01 | 2018 | Use most efficient type of electric motors | $274,952 | $196,499 | |
AS0450 #04 Y:2017 | 04 | 2017 | Avoid frost formation on evaporators | $865 | $195 | |
AS0450 #03 Y:2017 | 03 | 2017 | Utilize higher efficiency lamps and/or ballasts | $2,775 | $3,994 | |
AS0450 #02 Y:2017 | 02 | 2017 | Utilize energy-efficient belts and other improved mechanisms | $22,239 | $400 | |
AS0450 #01 Y:2017 | 01 | 2017 | Utilize a less expensive cooling method | $35,156 | $4,000 | |
UF0367 #08 Y:2005 | 08 | 2005 | Utilize controls to operate equipment only when needed | $7,198 | $23,500 | |
UF0367 #07 Y:2005 | 07 | 2005 | Insulate bare equipment | $1,974 | $700 |