| Assessment Year | 2018 |
|---|---|
| Principal Product | Packaged Ice |
| NAICS | 312113: Ice Manufacturing |
| SIC | 2097: Manufactured Ice |
| Sales Range | $1 M to 5M |
| # of Employees | 80 |
| Plant Area |
83,000
ft2
|
| Annual Production | 45,000,000
units
|
| Production Hrs. Annual | 5,640
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $209,230 | 2,332,400 |
kWh
|
$0.090 | |
| Electricity Demand | $35,529 | 6,396 |
kW-mo/yr
|
$5.55 | |
| Electricity Fees | $475 | - |
|
- | |
| Waste Disposal Costs | |||||
| Water Usage | $92,471 | 11,984 |
Tgal
|
$7.72 | |
| TOTAL YEARLY COSTS | $337,705 | ||||
| RECOMMENDED SAVINGS* | $61,035 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $2,775 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2628: Utilize a less expensive cooling method | $35,156 | $4,000 |
$35,156
390,625
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $22,239 | $400 |
$19,242
213,798
kWh
|
$2,997
-
kW-mo/yr
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,775 | $3,994 |
$2,511
27,904
kWh
|
$264
-
kW-mo/yr
|
|
| 04 | 2.2626: Avoid frost formation on evaporators | $865 | $195 |
$748
8,313
kWh
|
$117
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $61,035 | $8,589 |
$57,657
640,640
kWh
|
$3,378
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $2,775 | $3,994 |
$2,511
27,904
kWh
|
$264
-
kW-mo/yr
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs