ITAC Assessment: AS0450
ITAC logo
ITAC Assessment: AS0450
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Packaged Ice
NAICS 312113: Ice Manufacturing
SIC 2097: Manufactured Ice
Sales Range $1
M
to 5
M
# of Employees 80
Plant Area 83,000
ft2
Annual Production 45,000,000
units
Production Hrs. Annual 5,640
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,230 2,332,400
kWh
Electricity Demand $35,529 6,396
kW-mo/yr
Electricity Fees $475 -
Waste Disposal Costs
Water Usage $92,471 11,984
Tgal
TOTAL YEARLY COSTS $337,705
RECOMMENDED SAVINGS* $61,035 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,775

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2628: Utilize a less expensive cooling method $35,156 $4,000 $35,156
390,625
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $22,239 $400 $19,242
213,798
kWh
$2,997
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,775 $3,994 $2,511
27,904
kWh
$264
-
kW-mo/yr
04 2.2626: Avoid frost formation on evaporators $865 $195 $748
8,313
kWh
$117
-
kW-mo/yr
TOTAL RECOMMENDED $61,035 $8,589 $57,657
640,640
kWh
$3,378
-
kW-mo/yr
TOTAL IMPLEMENTED $2,775 $3,994 $2,511
27,904
kWh
$264
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs