ITAC Assessment: MI0200
ITAC logo
ITAC Assessment: MI0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 60,000
ft2
Annual Production 120
pieces
Production Hrs. Annual 2,397
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,002 722,880
kWh
Electricity Demand $18,026 2,229
kW-mo/yr
Electricity Fees $10,290 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,360

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $7,552 $4,960 $5,465
51,561
kWh
$2,087
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,382 $17,910 $4,618
43,565
kWh
$1,764
-
kW-mo/yr
03 2.7221: Lower temperature during the winter season and vice-versa $4,945 $2,000 $3,578
33,759
kWh
$1,367
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,155 $1,210 $3,467
32,706
kWh
$688
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,326 $40 $2,528
23,852
kWh
$798
-
kW-mo/yr
TOTAL RECOMMENDED $26,360 $26,120 $19,656
185,443
kWh
$6,704
-
kW-mo/yr
TOTAL IMPLEMENTED $26,360 $26,120 $19,656
185,443
kWh
$6,704
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs