ITAC Assessment: RU0122
ITAC logo
ITAC Assessment: RU0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FOLDED PAPER BOXES
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 200,000
thousand feet
Production Hrs. Annual 4,550
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,885 902,989
kWh
Natural Gas $47,159 7,981
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,049 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,462 - $1,462
13,189
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,447 $272 $1,447
12,896
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,176 $30 $3,176
28,429
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,355 $326 $2,355
21,102
kWh
-
05 2.4133: Use most efficient type of electric motors $728 $5,243 $728
6,448
kWh
-
06 2.7492: Use proper thickness of insulation on building envelope $645 $90 $345
3,224
kWh
$300
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $236 $500 - $236
-
MMBtu
TOTAL RECOMMENDED $10,049 $6,461 $9,513
85,288
kWh
$536
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs