ITAC Assessment: LE0520
ITAC logo
ITAC Assessment: LE0520
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Ice
NAICS 312113: Ice Manufacturing
SIC 2097: Manufactured Ice
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 120,000
ft2
Annual Production 20,000,000
units
Production Hrs. Annual 6,212
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $251,075 4,649,541
kWh
Electricity Demand $47,773 11,484
kW-mo/yr
Electricity Fees $61,403 -
TOTAL YEARLY COSTS $360,251
RECOMMENDED SAVINGS* $19,887 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,247

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,006 $35 $848
15,701
kWh
$158
-
kW-mo/yr
02 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $9,676 $23,000 $8,981
166,317
kWh
$695
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,247 $4,450 $1,076
19,920
kWh
$171
-
kW-mo/yr
04 2.4133: Use most efficient type of electric motors $7,958 $50,000 $7,197
133,282
kWh
$761
-
kW-mo/yr
TOTAL RECOMMENDED $19,887 $77,485 $18,102
335,220
kWh
$1,785
-
kW-mo/yr
TOTAL IMPLEMENTED $1,247 $4,450 $1,076
19,920
kWh
$171
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs