ITAC Assessment: OR0256
ITAC logo
ITAC Assessment: OR0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Injection Molded Plastics
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 60,000
ft2
Annual Production 600,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,910 2,515,240
kWh
Electricity Demand $11,531 7,188
kW-mo/yr
Electricity Fees $2,946 -
Natural Gas $5,919 1,122
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,551 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,512

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 3.6192: Use a less expensive method of waste removal $2,446 $560 - - - - $2,446
02 2.2437: Recover waste heat from equipment $1,920 $1,190 - - - $1,920
-
MMBtu
-
03 2.2511: Insulate bare equipment $1,860 $2,290 $1,860
62,720
kWh
- - - -
04 2.4133: Use most efficient type of electric motors $830 $2,626 $730
24,619
kWh
$100
-
kW-mo/yr
- - -
05 2.3212: Optimize plant power factor $2,259 $6,400 - - $2,259 - -
06 2.6231: Utilize controls to operate equipment only when needed $2,660 $16,440 $2,660
89,390
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $576 $6,630 $518
17,292
kWh
$58
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $12,551 $36,136 $5,768
194,021
kWh
$158
-
kW-mo/yr
$2,259 $1,920
-
MMBtu
$2,446
TOTAL IMPLEMENTED $6,512 $26,256 $3,908
131,301
kWh
$158
-
kW-mo/yr
- - $2,446
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs