ITAC Assessment: AS0454
ITAC logo
ITAC Assessment: AS0454
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Packaged Ice
NAICS 312113: Ice Manufacturing
SIC 2097: Manufactured Ice
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 80,000
ft2
Annual Production 200,000,000
lb
Production Hrs. Annual 7,300
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,128,432 12,912,476
kWh
Electricity Demand $193,237 32,193
kW-mo/yr
TOTAL YEARLY COSTS $1,321,669
RECOMMENDED SAVINGS* $381,478 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4133: Use most efficient type of electric motors $274,952 $196,499 $246,461
2,823,154
kWh
$28,491
-
kW-mo/yr
02 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $64,677 - $64,677
740,880
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,697 $12,185 $12,185
139,577
kWh
$1,512
-
kW-mo/yr
04 3.1162: Use less wasteful packaging $12,596 $196 $12,596
144,279
kWh
-
05 2.3113: Make ice during off peak hours for cooling $11,530 $150 $2,553
29,249
kWh
$8,977
-
kW-mo/yr
06 2.2511: Insulate bare equipment $4,026 $3,043 $3,616
41,423
kWh
$410
-
kW-mo/yr
TOTAL RECOMMENDED $381,478 $212,073 $342,088
3,918,562
kWh
$39,390
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs