ITAC Assessment: UW2302
ITAC logo
ITAC Assessment: UW2302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product sheet metal work manufacturing
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 100,000
ft2
Annual Production 509,000
units
Production Hrs. Annual 5,928
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,067 1,240,500
kWh
Electricity Demand $24,664 4,399
kW-mo/yr
Electricity Fees $22,408 -
Natural Gas $19,363 1,764
MMBtu
TOTAL YEARLY COSTS $164,502
RECOMMENDED SAVINGS* $4,957 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,949 $4,760 $1,704
21,558
kWh
$245
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $890 $1,114 $778
9,847
kWh
$112
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,679 - $1,468
18,574
kWh
$211
-
kW-mo/yr
-
04 2.7224: Reduce space conditioning during non-working hours $439 - - - $439
-
MMBtu
TOTAL RECOMMENDED $4,957 $5,874 $3,950
49,979
kWh
$568
-
kW-mo/yr
$439
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs