ITAC Assessment: OR0734
ITAC logo
ITAC Assessment: OR0734
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Ice
NAICS 312113: Ice Manufacturing
SIC 2097: Manufactured Ice
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 56,000
ft2
Annual Production 67,400,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,544 4,258,380
kWh
Electricity Demand $113,998 23,490
kW-mo/yr
Electricity Fees $32,479 -
Waste Disposal Costs
Water Usage $167,854 23,908
Tgal
Water Disposal $15,266 1,047
Tgal
TOTAL YEARLY COSTS $560,141
RECOMMENDED SAVINGS* $192,319 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 3.2176: Increase use of automation $126,455 $360,000 - - $6,230 - - $120,225 -
02 4.113: Install refrigeration system to cool product $44,429 $117,388 $(-11,291.0)
(-163,593)
kWh
$(-1,280.0)
-
kW-mo/yr
- - - - $57,000
03 3.4111: Use closed cycle process to minimize waste water production $20,357 $6,830 - - - $6,618
-
Tgal
$13,739
-
Tgal
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,078 $220 $689
13,354
kWh
$389
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $192,319 $484,438 $(-10,602.0)
(-150,239)
kWh
$(-891.0)
-
kW-mo/yr
$6,230 $6,618
-
Tgal
$13,739
-
Tgal
$120,225 $57,000
TOTAL IMPLEMENTED - - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs