ITAC Assessment: CL1804
ITAC logo
ITAC Assessment: CL1804
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Performance Fabrics
NAICS 313310: Textile and Fabric Finishing Mills
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $100
M
to 500
M
# of Employees 750
Plant Area 1,000,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,923,066 78,461,317
kWh
Electricity Demand $108,560 11,800
kW-mo/yr
Natural Gas $450,646 91,224
MMBtu
Waste Disposal Costs
Water Usage $394,089 63,392,400
Tgal
TOTAL YEARLY COSTS $4,876,361
RECOMMENDED SAVINGS* $319,024 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $242,568

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $156,853 $28,500 $125,207
2,504,147
kWh
$31,646
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $46,306 $184,601 $34,203
684,066
kWh
$12,103
-
kW-mo/yr
- -
03 2.2414: Use waste heat from hot flue gases to preheat $42,335 $15,500 - - $42,335
-
MMBtu
-
04 3.4156: Use flow control valves on equipment to optimize water use $39,409 $3,050 - - - $39,409
-
Tgal
05 2.2614: Use cooling tower or economizer to replace chiller cooling $34,121 $34,121 $17,561
351,234
kWh
$16,560
-
kW-mo/yr
- -
TOTAL RECOMMENDED $319,024 $265,772 $176,971
3,539,447
kWh
$60,309
-
kW-mo/yr
$42,335
-
MMBtu
$39,409
-
Tgal
TOTAL IMPLEMENTED $242,568 $216,151 $159,410
3,188,213
kWh
$43,749
-
kW-mo/yr
- $39,409
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs