ITAC Assessment: MS0071
ITAC logo
ITAC Assessment: MS0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Clothing
NAICS
n/a
SIC 2326: Men's and Boys' Work Clothing
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 165,000
ft2
Annual Production 21,888,000
pieces
Production Hrs. Annual 3,840
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,205 4,165,299
kWh
Electricity Demand $102,690 11,709
kW-mo/yr
Electricity Fees $3,582 -
Natural Gas $17,898 6,156
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,507 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,052 $47,376 $9,128
294,256
kWh
$9,924
-
kW-mo/yr
- -
02 2.4314: Use synthetic lubricant $972 $180 $330
10,551
kWh
$642
-
kW-mo/yr
- -
03 2.7314: Reduce ventilation air $3,442 $3,975 $750
24,033
kWh
$2,692
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $1,192 $750 - $1,192
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $1,017 $2,926 - - $1,017
-
MMBtu
-
06 2.2437: Recover waste heat from equipment $4,751 $13,574 - - $4,751
-
MMBtu
-
07 2.7224: Reduce space conditioning during non-working hours $3,597 $8,560 $3,597
116,061
kWh
- - -
08 3.5313: Increase amount of waste recovered for resale $9,720 - - - - $9,720
-
lb
09 3.5315: Lease / purchase baler; sell cardboard to recycler $12,764 $15,100 - - - $12,764
-
lb
TOTAL RECOMMENDED $56,507 $92,441 $13,805
444,901
kWh
$14,450
-
kW-mo/yr
$5,768
-
MMBtu
$22,484
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs