ITAC Assessment: OK0058
ITAC logo
ITAC Assessment: OK0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product OFFICE SUPPLIES/PRINTING
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 90
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,026 385,698
kWh
Natural Gas $4,856 1,371
MMBtu
Other Energy $80,000 7,936
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,292 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $820

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Other Energy Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $261 $270 $261
4,396
kWh
- -
02 2.1335: Replace gasoline with diesel, lpg, or natural gas $19,472 $16,000 - $(-60,528.0)
-
MMBtu
$80,000
-
MMBtu
03 2.7422: Plant trees or shrubs near windows to shield from sunlight $194 $475 $194
5,862
kWh
- -
04 2.8122: Use utility controlled power management $365 - $365
-
kWh
- -
TOTAL RECOMMENDED $20,292 $16,745 $820
10,258
kWh
$(-60,528.0)
-
MMBtu
$80,000
-
MMBtu
TOTAL IMPLEMENTED $820 $745 $820
10,258
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs