Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

127

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous food preparations and kindred
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0660 #02 Y:2015 Install occupancy sensors $3,310 $8,500
OR0660 #01 Y:2015 Change procedures / equipment / operating conditions $135,000 $250,000
OR0654 #06 Y:2015 Use solar heat to make electricty $2,026 $9,325
OR0654 #05 Y:2015 Install equipment (eg compactor) to reduce disposal costs $6,722 $60,000
OR0654 #04 Y:2015 Utilize controls to operate equipment only when needed $2,588 $5,986
OR0654 #03 Y:2015 Modify facility to avoid excess maintenance costs $115,650 $50,000
OR0654 #02 Y:2015 Modify workload $23,248 $10,000
OR0654 #01 Y:2015 Change procedures / equipment / operating conditions $1,067,158 $300,000
OR0614 #05 Y:2013 Insulate bare equipment $667 $446
OR0614 #04 Y:2013 Use waste heat from hot flue gases to preheat $1,554 $1,828
OR0614 #03 Y:2013 Analyze flue gas for proper air/fuel ratio $4,327 -
OR0614 #02 Y:2013 Modify refrigeration system to operate at a lower pressure $16,101 $10,000
OR0614 #01 Y:2013 Modify refrigeration system to operate at a lower pressure $31,637 $42,000
BS0020 #06 Y:2013 Cover open tanks $3,845 $6,050
BS0020 #05 Y:2013 Insulate bare equipment $9,887 $5,300
BS0020 #04 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $13,831 $15,600
BS0020 #03 Y:2013 Utilize higher efficiency lamps and/or ballasts $8,893 $71,307
BS0020 #02 Y:2013 Optimize plant power factor $18,318 $19,262
BS0020 #01 Y:2013 Redesign process $15,024 $15,359
OR0596 #07 Y:2012 Treat and reuse rinse waters $48,291 $10,000