Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Snacks
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 6,570,000
lb
Production Hrs. Annual 5,616
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,567 1,396,175
kWh
Electricity Demand $26,715 3,365
kW-mo/yr
Electricity Fees $2,078 -
Natural Gas $388,716 809,085
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $165,821 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,070

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,782 $7,200 - - - - - $4,782
-
lb
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,010 $7,460 $3,232
46,038
kWh
- - - - - $427 $351 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,779 $2,217 $2,820
42,909
kWh
$959
-
kW-mo/yr
- - - - - - -
04 2.8227: Adjust / maintain fork lift trucks for most efficient operation $9,274 $46,450 $(-2,271.0)
(-34,560)
kWh
$(-451.0)
-
kW-mo/yr
- $4,800
-
MMBtu
- - $7,196 - -
05 2.4239: Eliminate or reduce compressed air usage $15,326 $6,711 $11,131
169,399
kWh
$4,195
-
kW-mo/yr
- - - - - - -
06 2.2414: Use waste heat from hot flue gases to preheat $80,359 $51,328 - - $80,359
-
MMBtu
- - - - - -
07 3.4113: Treat and reuse rinse waters $48,291 $10,000 $(-81.0)
-
kWh
- - - $34,990
-
Tgal
- $(-720.0) - $14,102
-
Tgal
TOTAL RECOMMENDED $165,821 $131,366 $14,831
223,786
kWh
$4,703
-
kW-mo/yr
$80,359
-
MMBtu
$4,800
-
MMBtu
$34,990
-
Tgal
$4,782
-
lb
$6,903 $351 $14,102
-
Tgal
TOTAL IMPLEMENTED $52,070 $12,217 $2,739
42,909
kWh
$959
-
kW-mo/yr
- - $34,990
-
Tgal
- $(-720.0) - $14,102
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs