ITAC Assessment: OR0614
ITAC logo
ITAC Assessment: OR0614
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Seafood Products
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 95,000
ft2
Annual Production 12,492,000
lb
Production Hrs. Annual 4,680
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $371,937 6,045,600
kWh
Electricity Demand $99,339 13,757
kW-mo/yr
Natural Gas $151,317 22,287
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,286 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,428

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $31,637 $42,000 $26,341
428,171
kWh
$5,296
-
kW-mo/yr
- -
02 2.2621: Modify refrigeration system to operate at a lower pressure $16,101 $10,000 $16,101
261,727
kWh
- - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $4,327 - - - $5,327
-
MMBtu
$(-1,000.0)
04 2.2414: Use waste heat from hot flue gases to preheat $1,554 $1,828 - - $1,554
-
MMBtu
-
05 2.2511: Insulate bare equipment $667 $446 - - $667
-
MMBtu
-
TOTAL RECOMMENDED $54,286 $54,274 $42,442
689,898
kWh
$5,296
-
kW-mo/yr
$7,548
-
MMBtu
$(-1,000.0)
TOTAL IMPLEMENTED $20,428 $10,000 $16,101
261,727
kWh
- $5,327
-
MMBtu
$(-1,000.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs