ITAC Assessment: OR0654
ITAC logo
ITAC Assessment: OR0654
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Packaged Seafood
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $100
M
to 500
M
# of Employees 34
Plant Area 28,000
ft2
Annual Production 28,000,000
pieces
Production Hrs. Annual 7,800
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,719 4,122,840
kWh
Electricity Demand $91,302 14,444
kW-mo/yr
Electricity Fees $19,982 -
Natural Gas $4,905 447
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,217,392 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,210,670

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Raw Material Savings Increase in Production Savings
01 3.1191: Change procedures / equipment / operating conditions $1,067,158 $300,000 - - - $599,158 $468,000
02 4.426: Modify workload $23,248 $10,000 $(-672.0)
(-12,480)
kWh
- $23,920 - -
03 4.463: Modify facility to avoid excess maintenance costs $115,650 $50,000 $(-9,150.0)
(-124,800)
kWh
- $124,800 - -
04 2.6231: Utilize controls to operate equipment only when needed $2,588 $5,986 $2,588
48,066
kWh
- - - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,722 $60,000 - - $6,722 - -
06 2.9114: Use solar heat to make electricty $2,026 $9,325 $1,944
36,097
kWh
$82
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $1,217,392 $435,311 $(-5,290.0)
(-53,117)
kWh
$82
-
kW-mo/yr
$155,442 $599,158 $468,000
TOTAL IMPLEMENTED $1,210,670 $375,311 $(-5,290.0)
(-53,117)
kWh
$82
-
kW-mo/yr
$148,720 $599,158 $468,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Raw Material Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs