ITAC Assessment: MO0053
ITAC logo
ITAC Assessment: MO0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CIRCUIT BREAKERS
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area
n/a
Annual Production 1,520,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $625,758 10,556,565
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,088 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,637

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $47,665 $29,000 $82,015
1,383,939
kWh
$(-34,350.0)
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,312 - $9,252
156,213
kWh
$(-3,940.0)
-
MMBtu
03 2.4133: Use most efficient type of electric motors $959 - $959
16,120
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,537 $958 $4,537
76,495
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,972 $5,350 $1,972
33,411
kWh
-
06 2.4133: Use most efficient type of electric motors $1,845 - $1,845
31,067
kWh
-
07 2.2511: Insulate bare equipment $29,176 $3,956 $29,176
492,380
kWh
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $2,123 $3,321 $2,123
36,928
kWh
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,499 $50 $2,499
42,204
kWh
-
TOTAL RECOMMENDED $96,088 $42,635 $134,378
2,268,757
kWh
$(-38,290.0)
-
MMBtu
TOTAL IMPLEMENTED $49,637 $34,350 $83,987
1,417,350
kWh
$(-34,350.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs