Assessment Year | 2004 |
---|---|
Principal Product | Laminated Hardwood |
NAICS | 321999: All Other Miscellaneous Wood Product Manufacturing |
SIC | 2499: Wood Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 75 |
Plant Area |
120,000
ft2
|
Annual Production | 4,500,000
pieces
|
Production Hrs. Annual | 2,040
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $91,794 | 2,042,641 |
kWh
|
$0.045 |
Electricity Demand | $81,816 | 8,694 |
kW-mo/yr
|
$9.41 |
Natural Gas | $5,982 | 515 |
MMBtu
|
$11.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $185,568 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,765 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Wood Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.5311: Recover and reuse waste material | $132,275 | $20,000 | - | - | - | - | - |
$132,275
-
lb
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $37,431 | $2,000 | - | - | - | - |
$37,431
-
MMBtu
|
- | |
03 | 2.1393: Use steam sparging or injections in place of indirect heating | $5,226 | $10,000 | - | - | - |
$5,226
-
MMBtu
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,768 | $200 |
$1,685
37,418
kWh
|
$2,083
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.6218: Turn off equipment when not in use | $3,160 | - |
$3,160
70,225
kWh
|
- | - | - | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,566 | - |
$1,366
30,355
kWh
|
$1,200
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.3212: Optimize plant power factor | $860 | $4,250 | - | - | $860 | - | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $282 | - |
$282
6,263
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $185,568 | $36,450 |
$6,493
144,261
kWh
|
$3,283
-
kW-mo/yr
|
$860 |
$5,226
-
MMBtu
|
$37,431
-
MMBtu
|
$132,275
-
lb
|
||
TOTAL IMPLEMENTED | $43,765 | $2,200 |
$3,051
67,773
kWh
|
$3,283
-
kW-mo/yr
|
- | - |
$37,431
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Wood Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs