ITAC Assessment: NC0216
ITAC logo
ITAC Assessment: NC0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Catalytic converters for boilers
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 100,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 8,600
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,701 6,529,015
kWh
Electricity Demand $98,933 11,039
kW-mo/yr
Electricity Fees $9,626 -
Natural Gas $253,001 31,893
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $195,884 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,699

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4154: Avoid rewinding motors more than twice $902 $662 $598
23,106
kWh
$304
-
kW-mo/yr
- - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,475 $1,464 $1,642
63,381
kWh
$833
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $340 $608 $226
8,713
kWh
$114
-
kW-mo/yr
- - - -
04 2.2511: Insulate bare equipment $1,799 $549 - - $1,799
-
MMBtu
- - -
05 2.2711: Utilize outside air instead of conditioned air for drying $9,998 $40,000 $14,807
571,706
kWh
$8,878
-
kW-mo/yr
$(-13,687.0)
-
MMBtu
- - -
06 3.3128: Utilize other methods to remove contaminants $50,246 $30,000 - - - $60,000
-
gal
$(-5,000.0) $(-4,754.0)
07 4.445: Install equipment to move product $130,124 $27,500 $746
28,810
kWh
$378
-
kW-mo/yr
- - $129,000 -
TOTAL RECOMMENDED $195,884 $100,783 $18,019
695,716
kWh
$10,507
-
kW-mo/yr
$(-11,888.0)
-
MMBtu
$60,000
-
gal
$124,000 $(-4,754.0)
TOTAL IMPLEMENTED $12,699 $41,211 $15,405
594,812
kWh
$9,182
-
kW-mo/yr
$(-11,888.0)
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs