ITAC Assessment: BS0020
ITAC logo
ITAC Assessment: BS0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Potato products
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 166,000
ft2
Annual Production 950,000
lb
Production Hrs. Annual 8,328
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $814,567 52,259,000
kWh
Electricity Demand $370,163 92,077
kW-mo/yr
Electricity Fees $23,718 -
Natural Gas $3,339,677 568,518
MMBtu
Other Gas $1,014,280 228,474
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,798 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.5194: Redesign process $15,024 $15,359 $15,024
910,549
kWh
- - -
02 2.3212: Optimize plant power factor $18,318 $19,262 - - $18,318 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,893 $71,307 $6,611
413,214
kWh
$2,282
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,831 $15,600 $9,674
604,646
kWh
$4,157
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $9,887 $5,300 - - - $9,887
-
MMBtu
06 2.2514: Cover open tanks $3,845 $6,050 - - - $3,845
-
MMBtu
TOTAL RECOMMENDED $69,798 $132,878 $31,309
1,928,409
kWh
$6,439
-
kW-mo/yr
$18,318 $13,732
-
MMBtu
TOTAL IMPLEMENTED $50,929 $111,469 $16,285
1,017,860
kWh
$6,439
-
kW-mo/yr
$18,318 $9,887
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs