| Assessment Year | 2013 |
|---|---|
| Principal Product | Potato products |
| NAICS | 311999: All Other Miscellaneous Food Manufacturing |
| SIC | 2099: Food Preparations, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 450 |
| Plant Area |
166,000
ft2
|
| Annual Production | 950,000
lb
|
| Production Hrs. Annual | 8,328
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $814,567 | 52,259,000 |
kWh
|
$0.016 |
| Electricity Demand | $370,163 | 92,077 |
kW-mo/yr
|
$4.02 |
| Electricity Fees | $23,718 | - |
|
- |
| Natural Gas | $3,339,677 | 568,518 |
MMBtu
|
$5.87 |
| Other Gas | $1,014,280 | 228,474 |
MMBtu
|
$4.44 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $69,798 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $50,929 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.5194: Redesign process | $15,024 | $15,359 |
$15,024
910,549
kWh
|
- | - | - | |
| 02 | 2.3212: Optimize plant power factor | $18,318 | $19,262 | - | - | $18,318 | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,893 | $71,307 |
$6,611
413,214
kWh
|
$2,282
-
kW-mo/yr
|
- | - | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,831 | $15,600 |
$9,674
604,646
kWh
|
$4,157
-
kW-mo/yr
|
- | - | |
| 05 | 2.2511: Insulate bare equipment | $9,887 | $5,300 | - | - | - |
$9,887
-
MMBtu
|
|
| 06 | 2.2514: Cover open tanks | $3,845 | $6,050 | - | - | - |
$3,845
-
MMBtu
|
|
| TOTAL RECOMMENDED | $69,798 | $132,878 |
$31,309
1,928,409
kWh
|
$6,439
-
kW-mo/yr
|
$18,318 |
$13,732
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $50,929 | $111,469 |
$16,285
1,017,860
kWh
|
$6,439
-
kW-mo/yr
|
$18,318 |
$9,887
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs