185
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Frozen fruits, fruit juices, and vegetables | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0780 #04 Y:2023 | 04 | 2023 | Use solar heat to make electricty | $1,666 | $24,285 | |
| OR0780 #03 Y:2023 | 03 | 2023 | Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $2,453 | $14,157 | |
| OR0780 #02 Y:2023 | 02 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $13,517 | $2,000 | |
| OR0780 #01 Y:2023 | 01 | 2023 | Use filtration, centrifuging to remove contaminants | $35,316 | $540,000 | |
| OR0775 #03 Y:2023 | 03 | 2023 | Use solar heat to make electricty | $2,277 | $41,745 | |
| OR0775 #02 Y:2023 | 02 | 2023 | Install occupancy sensors | $563 | $261 | |
| OR0775 #01 Y:2023 | 01 | 2023 | Add equipment/ operators to reduce production bottleneck | $174,406 | $233,000 | |
| OR0773 #04 Y:2023 | 04 | 2023 | Replace hydraulic / pneumatic equipment with electric equipment | $1,262 | $12,121 | |
| OR0773 #03 Y:2023 | 03 | 2023 | Preheat boiler makeup water with waste process heat | $8,507 | $13,124 | |
| OR0773 #02 Y:2023 | 02 | 2023 | Install / repair insulation on steam lines | $1,051 | $797 | |
| OR0773 #01 Y:2023 | 01 | 2023 | Use hot process fluids to preheat incoming process fluids | $5,439 | $1,278 | |
| OR0757 #04 Y:2022 | 04 | 2022 | Add equipment/ operators to reduce production bottleneck | $194,400 | $300,000 | |
| OR0757 #03 Y:2022 | 03 | 2022 | Install automatic packing equipment | $97,200 | $50,000 | |
| OR0757 #02 Y:2022 | 02 | 2022 | Optimize production lot sizes and inventories | $26,900 | - | |
| OR0757 #01 Y:2022 | 01 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $1,612 | - | |
| OR0694 #06 Y:2017 | 06 | 2017 | Minimize water usage | $8,079 | $15,125 | |
| OR0694 #05 Y:2017 | 05 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,605 | $10,606 | |
| OR0694 #04 Y:2017 | 04 | 2017 | Install equipment (eg compactor) to reduce disposal costs | $29,962 | $12,100 | |
| OR0694 #03 Y:2017 | 03 | 2017 | Install back-up equipment | $219,130 | $45,000 | |
| OR0694 #02 Y:2017 | 02 | 2017 | Begin a practice of predictive / preventative maintenance | $78,503 | $7,018 |