Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

185

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Frozen fruits, fruit juices, and vegetables
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0780 #04 Y:2023 Use solar heat to make electricty $1,666 $24,285
OR0780 #03 Y:2023 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $2,453 $14,157
OR0780 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $13,517 $2,000
OR0780 #01 Y:2023 Use filtration, centrifuging to remove contaminants $35,316 $540,000
OR0775 #03 Y:2023 Use solar heat to make electricty $2,277 $41,745
OR0775 #02 Y:2023 Install occupancy sensors $563 $261
OR0775 #01 Y:2023 Add equipment/ operators to reduce production bottleneck $174,406 $233,000
OR0773 #04 Y:2023 Replace hydraulic / pneumatic equipment with electric equipment $1,262 $12,121
OR0773 #03 Y:2023 Preheat boiler makeup water with waste process heat $8,507 $13,124
OR0773 #02 Y:2023 Install / repair insulation on steam lines $1,051 $797
OR0773 #01 Y:2023 Use hot process fluids to preheat incoming process fluids $5,439 $1,278
OR0757 #04 Y:2022 Add equipment/ operators to reduce production bottleneck $194,400 $300,000
OR0757 #03 Y:2022 Install automatic packing equipment $97,200 $50,000
OR0757 #02 Y:2022 Optimize production lot sizes and inventories $26,900 -
OR0757 #01 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $1,612 -
OR0694 #06 Y:2017 Minimize water usage $8,079 $15,125
OR0694 #05 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $9,605 $10,606
OR0694 #04 Y:2017 Install equipment (eg compactor) to reduce disposal costs $29,962 $12,100
OR0694 #03 Y:2017 Install back-up equipment $219,130 $45,000
OR0694 #02 Y:2017 Begin a practice of predictive / preventative maintenance $78,503 $7,018