ITAC Assessment: OR0757
ITAC logo
ITAC Assessment: OR0757
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Fruit/vegetable puree
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $50
M
to 100
M
# of Employees 750
Plant Area 325,000
ft2
Annual Production 112,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $326,718 7,393,127
kWh
Electricity Demand $252,339 26,919
kW-mo/yr
Electricity Fees $46,664 -
Natural Gas $67,439 70,440
MMBtu
TOTAL YEARLY COSTS $693,160
RECOMMENDED SAVINGS* $320,112 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,612 - $1,147
26,856
kWh
$465
-
kW-mo/yr
- -
02 4.321: Optimize production lot sizes and inventories $26,900 - - - - $26,900
03 4.441: Install automatic packing equipment $97,200 $50,000 - - $97,200 -
04 4.111: Add equipment/ operators to reduce production bottleneck $194,400 $300,000 - - $194,400 -
TOTAL RECOMMENDED $320,112 $350,000 $1,147
26,856
kWh
$465
-
kW-mo/yr
$291,600 $26,900
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs