ITAC Assessment: BD0378
ITAC logo
ITAC Assessment: BD0378
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Automobile structural parts
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 314,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,631 4,867,600
kWh
Electricity Demand $243,399 17,898
kW-mo/yr
Electricity Fees $42,472 -
Natural Gas $133,857 15,255
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,039 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,404

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $9,404 $12,450 $4,438
134,496
kWh
$4,966
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,696 $100 $2,846
86,234
kWh
$2,850
-
kW-mo/yr
- -
03 2.7134: Use photocell controls $1,578 $835 $416
12,591
kWh
$602
-
kW-mo/yr
$133 $427
04 2.7142: Utilize higher efficiency lamps and/or ballasts $361 $425 $165
4,993
kWh
$93
-
kW-mo/yr
$43 $60
TOTAL RECOMMENDED $17,039 $13,810 $7,865
238,314
kWh
$8,511
-
kW-mo/yr
$176 $487
TOTAL IMPLEMENTED $9,404 $12,450 $4,438
134,496
kWh
$4,966
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs