ITAC Assessment: RU0098
ITAC logo
ITAC Assessment: RU0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CORRUGATED CONTAINERS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $5
M
to 10
M
# of Employees 68
Plant Area
n/a
Annual Production 144,000
thousand feet
Production Hrs. Annual 4,370
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,863 820,926
kWh
Natural Gas $66,495 14,997
MMBtu
Fuel Oil #2 $13,600 2,380
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,747 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,114

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,642 - $1,642
15,240
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,589 $196 $1,589
14,654
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $1,134 $302 $1,134
10,551
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,244 - $3,244
30,188
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,377 $1,250 $2,377
21,981
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,352 $500 - $1,012
-
MMBtu
$340
-
MMBtu
07 2.2414: Use waste heat from hot flue gases to preheat $6,437 $6,800 - $4,819
-
MMBtu
$1,618
-
MMBtu
08 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $7,333 $13,400 - $7,333
-
MMBtu
-
09 2.2135: Repair and eliminate steam leaks $11,639 $1,455 - $8,713
-
MMBtu
$2,926
-
MMBtu
TOTAL RECOMMENDED $36,747 $23,903 $9,986
92,614
kWh
$21,877
-
MMBtu
$4,884
-
MMBtu
TOTAL IMPLEMENTED $18,114 $1,651 $6,475
60,082
kWh
$8,713
-
MMBtu
$2,926
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs