Assessment Year | 1990 |
---|---|
Principal Product | CORRUGATED CONTAINERS |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $5 M to 10M |
# of Employees | 68 |
Plant Area |
n/a
|
Annual Production | 144,000
thousand feet
|
Production Hrs. Annual | 4,370
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $88,863 | 820,926 |
kWh
|
$0.11 |
Natural Gas | $66,495 | 14,997 |
MMBtu
|
$4.43 |
Fuel Oil #2 | $13,600 | 2,380 |
MMBtu
|
$5.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,747 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,114 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,642 | - |
$1,642
15,240
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,589 | $196 |
$1,589
14,654
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,134 | $302 |
$1,134
10,551
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,244 | - |
$3,244
30,188
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,377 | $1,250 |
$2,377
21,981
kWh
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,352 | $500 | - |
$1,012
-
MMBtu
|
$340
-
MMBtu
|
|
07 | 2.2414: Use waste heat from hot flue gases to preheat | $6,437 | $6,800 | - |
$4,819
-
MMBtu
|
$1,618
-
MMBtu
|
|
08 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $7,333 | $13,400 | - |
$7,333
-
MMBtu
|
- | |
09 | 2.2135: Repair and eliminate steam leaks | $11,639 | $1,455 | - |
$8,713
-
MMBtu
|
$2,926
-
MMBtu
|
|
TOTAL RECOMMENDED | $36,747 | $23,903 |
$9,986
92,614
kWh
|
$21,877
-
MMBtu
|
$4,884
-
MMBtu
|
||
TOTAL IMPLEMENTED | $18,114 | $1,651 |
$6,475
60,082
kWh
|
$8,713
-
MMBtu
|
$2,926
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs