Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Juice and Puree
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 43,680
ft2
Annual Production 110
units
Production Hrs. Annual 5,880
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,261 2,279,100
kWh
Electricity Demand $79,178 7,058
kW-mo/yr
Electricity Fees $81,599 -
Natural Gas $470,388 61,656
MMBtu
Waste Disposal Costs
Water Usage $275,788 75,786
Tgal
Water Disposal $225,963 35,537
Tgal
TOTAL YEARLY COSTS $1,233,177
RECOMMENDED SAVINGS* $16,259 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,490

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $5,439 $1,278 - - $5,439
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $1,051 $797 - - $1,051
-
MMBtu
03 2.2441: Preheat boiler makeup water with waste process heat $8,507 $13,124 - - $8,507
-
MMBtu
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,262 $12,121 $741
16,847
kWh
$521
-
kW-mo/yr
-
TOTAL RECOMMENDED $16,259 $27,320 $741
16,847
kWh
$521
-
kW-mo/yr
$14,997
-
MMBtu
TOTAL IMPLEMENTED $6,490 $2,075 - - $6,490
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs