ITAC Assessment: UD0353
ITAC logo
ITAC Assessment: UD0353
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PROGRESSIVE CAVITY PUMPS
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $50
M
to 100
M
# of Employees 436
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 8,300
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $589,873 10,344,666
kWh
Natural Gas $220,104 67,768
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,324 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $6,492 - - - $6,492
02 3.4115: Recover and reuse cooling water $54,322 - - - $54,322
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $29,392 - $31,392
-
kWh
- $(-2,000.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,700 - $2,686
55,979
kWh
$(-185.0)
-
MMBtu
$199
05 2.7261: Install timers and/or thermostats $5,466 $1,600 - $5,466
-
MMBtu
-
06 2.7494: Install storm windows and doors $877 $1,080 - $877
-
MMBtu
-
07 2.7314: Reduce ventilation air $2,075 $1,000 $161
7,327
kWh
$1,914
-
MMBtu
-
TOTAL RECOMMENDED $101,324 $3,680 $34,239
63,306
kWh
$8,072
-
MMBtu
$59,013
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs