Assessment Year | 1991 |
---|---|
Principal Product | PROGRESSIVE CAVITY PUMPS |
NAICS |
n/a
|
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $50 M to 100M |
# of Employees | 436 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,300
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $589,873 | 10,344,666 |
kWh
|
$0.057 |
Natural Gas | $220,104 | 67,768 |
MMBtu
|
$3.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $101,324 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $6,492 | - | - | - | $6,492 | |
02 | 3.4115: Recover and reuse cooling water | $54,322 | - | - | - | $54,322 | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $29,392 | - |
$31,392
-
kWh
|
- | $(-2,000.0) | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,700 | - |
$2,686
55,979
kWh
|
$(-185.0)
-
MMBtu
|
$199 | |
05 | 2.7261: Install timers and/or thermostats | $5,466 | $1,600 | - |
$5,466
-
MMBtu
|
- | |
06 | 2.7494: Install storm windows and doors | $877 | $1,080 | - |
$877
-
MMBtu
|
- | |
07 | 2.7314: Reduce ventilation air | $2,075 | $1,000 |
$161
7,327
kWh
|
$1,914
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $101,324 | $3,680 |
$34,239
63,306
kWh
|
$8,072
-
MMBtu
|
$59,013 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs