IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Juice and Puree
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 44,227
ft2
Annual Production 136
units
Production Hrs. Annual 7,296
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,623 2,298,203
kWh
Electricity Demand $17,509 3,070
kW-mo/yr
Natural Gas $242,268 70,640
MMBtu
Waste Disposal Costs
Water Usage $67,243 30,902
Tgal
Water Disposal $272,239 28,029
Tgal
TOTAL YEARLY COSTS $783,882
RECOMMENDED SAVINGS* $535,529 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Primary Product Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $190,250 $7,842 - - $(-2,950.0)
-
MMBtu
- - - $193,200 -
02 4.611: Begin a practice of predictive / preventative maintenance $78,503 $7,018 - - - - - - - $78,503
03 4.651: Install back-up equipment $219,130 $45,000 - - - - - $219,130 - -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $29,962 $12,100 - - - - - $29,962 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,605 $10,606 $9,043
130,760
kWh
$562
-
kW-mo/yr
- - - - - -
06 3.4151: Minimize water usage $8,079 $15,125 - - - $3,403
-
Tgal
$4,676
-
Tgal
- - -
TOTAL RECOMMENDED $535,529 $97,691 $9,043
130,760
kWh
$562
-
kW-mo/yr
$(-2,950.0)
-
MMBtu
$3,403
-
Tgal
$4,676
-
Tgal
$249,092 $193,200 $78,503
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs