ITAC Assessment: OR0780
ITAC logo
ITAC Assessment: OR0780
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Frozen blueberries, onions, bean sprouts, blackberries
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 110,000
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 5,304
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,401 5,154,152
kWh
Electricity Demand $217,602 17,961
kW-mo/yr
Electricity Fees $87,682 -
Natural Gas $29,791 3,679
MMBtu
Waste Disposal Costs
Water Usage $90,941 37,491
Tgal
Water Disposal $90,298 25,075
Tgal
Solid Waste (non-haz) $57,197 165,417
lb
TOTAL YEARLY COSTS $815,912
RECOMMENDED SAVINGS* $52,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,517

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 3.3122: Use filtration, centrifuging to remove contaminants $35,316 $540,000 $(-3,720.0)
(-75,000)
kWh
- $39,036
-
lb
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,517 $2,000 $9,329
188,042
kWh
$4,188
-
kW-mo/yr
-
03 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $2,453 $14,157 $2,453
49,448
kWh
- -
04 2.9114: Use solar heat to make electricty $1,666 $24,285 $1,666
35,790
kWh
- -
TOTAL RECOMMENDED $52,952 $580,442 $9,728
198,280
kWh
$4,188
-
kW-mo/yr
$39,036
-
lb
TOTAL IMPLEMENTED $13,517 $2,000 $9,329
188,042
kWh
$4,188
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs