Assessment Year | 2023 |
---|---|
Principal Product | Frozen blueberries, onions, bean sprouts, blackberries |
NAICS | 311411: Frozen Fruit, Juice, and Vegetable Manufacturing |
SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
110,000
ft2
|
Annual Production | 30,000,000
lb
|
Production Hrs. Annual | 5,304
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $242,401 | 5,154,152 |
kWh
|
$0.047 | |
Electricity Demand | $217,602 | 17,961 |
kW-mo/yr
|
$12.12 | |
Electricity Fees | $87,682 | - |
|
- | |
Natural Gas | $29,791 | 3,679 |
MMBtu
|
$8.10 | |
Waste Disposal Costs | |||||
Water Usage | $90,941 | 37,491 |
Tgal
|
$2.43 | |
Water Disposal | $90,298 | 25,075 |
Tgal
|
$3.60 | |
Solid Waste (non-haz) | $57,197 | 165,417 |
lb
|
$0.35 | |
TOTAL YEARLY COSTS | $815,912 | ||||
RECOMMENDED SAVINGS* | $52,952 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $13,517 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 3.3122: Use filtration, centrifuging to remove contaminants | $35,316 | $540,000 |
$(-3,720.0)
(-75,000)
kWh
|
- |
$39,036
-
lb
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,517 | $2,000 |
$9,329
188,042
kWh
|
$4,188
-
kW-mo/yr
|
- | |
03 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $2,453 | $14,157 |
$2,453
49,448
kWh
|
- | - | |
04 | 2.9114: Use solar heat to make electricty | $1,666 | $24,285 |
$1,666
35,790
kWh
|
- | - | |
TOTAL RECOMMENDED | $52,952 | $580,442 |
$9,728
198,280
kWh
|
$4,188
-
kW-mo/yr
|
$39,036
-
lb
|
||
TOTAL IMPLEMENTED | $13,517 | $2,000 |
$9,329
188,042
kWh
|
$4,188
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs