ITAC Assessment: ND0181
ITAC logo
ITAC Assessment: ND0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product potato chips
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 414,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 4,290
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,152 1,697,538
kWh
Natural Gas $135,770 29,578
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,818 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,993

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1223: Install smaller boiler (increase high fire duty cycle) $22,783 $73,000 $6,466
80,012
kWh
$16,317
-
MMBtu
-
02 2.8121: Apply for tax-free status for energy purchases $6,483 $250 - - $6,483
03 2.8121: Apply for tax-free status for energy purchases $6,084 $250 - - $6,084
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,903 $548 $5,903
73,564
kWh
- -
05 2.7111: Reduce illumination to minimum necessary levels $4,467 $400 $4,467
55,686
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,747 $500 $3,747
33,118
kWh
- -
07 2.4133: Use most efficient type of electric motors $611 $419 $611
7,620
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $564 $375 $564
7,034
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $176 $200 $176
2,345
kWh
- -
TOTAL RECOMMENDED $50,818 $75,942 $21,934
259,379
kWh
$16,317
-
MMBtu
$12,567
TOTAL IMPLEMENTED $39,993 $74,100 $11,109
138,043
kWh
$16,317
-
MMBtu
$12,567
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs