Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Construction sand and gravel
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0781 #04 Y:2023 Use or replace with energy efficient substitutes $486,797 $4,030,000
OR0781 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $618 $2,576
OR0781 #02 Y:2023 Optimize plant power factor $3,665 $20,839
OR0781 #01 Y:2023 Eliminate/reduce an operation $112,997 $116,429
OR0730 #05 Y:2019 Utilize higher efficiency lamps and/or ballasts $1,030 $2,058
OR0730 #04 Y:2019 Optimize plant power factor $2,657 $9,364
OR0730 #03 Y:2019 Utilize energy-efficient belts and other improved mechanisms $2,201 -
OR0730 #02 Y:2019 Modify workload $13,223 $18,824
OR0730 #01 Y:2019 Optimize production lot sizes and inventories $15,651 $5,000
SU0284 #04 Y:2009 Utilize higher efficiency lamps and/or ballasts $2,370 $4,766
SU0284 #03 Y:2009 Replace fossil fuel equipment with electrical equipment $62,238 $73,214
SU0284 #02 Y:2009 Conserve energy by efficient use of vending machines $181 $197
SU0284 #01 Y:2009 Utilize energy-efficient belts and other improved mechanisms $3,788 -
AS0379 #06 Y:2004 Utilize higher efficiency lamps and/or ballasts $882 $3,715
AS0379 #05 Y:2004 Use most efficient type of electric motors $1,661 $1,885
AS0379 #04 Y:2004 Replace electric motor with fossil fuel engine $49,440 $190,300
AS0379 #03 Y:2004 Install equipment to move product $32,901 $159,000
AS0379 #02 Y:2004 Reduce the pressure of compressed air to the minimum required $771 $18
AS0379 #01 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $4,855 $60
SU0177 #05 Y:2003 Change rate schedules or other changes in utility service $18,711 $134,000