ITAC Assessment: OR0781
ITAC logo
ITAC Assessment: OR0781
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Aggregate
NAICS 212321: Construction Sand and Gravel Mining
SIC 1442: Construction Sand and Gravel
Sales Range $10
M
to 50
M
# of Employees 24
Plant Area 1,700,000
ft2
Annual Production 1,200,000
ton
Production Hrs. Annual 2,860
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,277 2,339,335
kWh
Electricity Demand $156,890 13,810
kW-mo/yr
Electricity Fees $1,034 -
Other Energy $313,837 11,403
MMBtu
TOTAL YEARLY COSTS $594,038
RECOMMENDED SAVINGS* $604,077 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $618

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Energy Savings One-time Revenue or Avoided Cost Savings
01 3.1161: Eliminate/reduce an operation $112,997 $116,429 - - - $40,363
-
MMBtu
$72,634
02 2.3212: Optimize plant power factor $3,665 $20,839 - - $3,665 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $618 $2,576 $618
11,815
kWh
- - - -
04 2.4322: Use or replace with energy efficient substitutes $486,797 $4,030,000 $(-45,001.0)
(-860,937)
kWh
$(-61,021.0)
-
kW-mo/yr
- $150,352
-
MMBtu
$442,467
TOTAL RECOMMENDED $604,077 $4,169,844 $(-44,383.0)
(-849,122)
kWh
$(-61,021.0)
-
kW-mo/yr
$3,665 $190,715
-
MMBtu
$515,101
TOTAL IMPLEMENTED $618 $2,576 $618
11,815
kWh
- - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs