ITAC Assessment: SU0284
ITAC logo
ITAC Assessment: SU0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Sand and Gravel
NAICS 212321: Construction Sand and Gravel Mining
SIC 1442: Construction Sand and Gravel
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 13,068,000
ft2
Annual Production 265,000
ton
Production Hrs. Annual 3,276
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,187 16,440
kWh
Electricity Demand $535 56
kW-mo/yr
Electricity Fees $996 -
Fuel Oil #2 $392,848 97,099
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,577 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,207

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,788 - - - $3,788
-
MMBtu
02 2.6211: Conserve energy by efficient use of vending machines $181 $197 $181
1,641
kWh
- -
03 2.1321: Replace fossil fuel equipment with electrical equipment $62,238 $73,214 $(-125,931.0)
(-1,259,309)
kWh
$(-68,531.0)
-
kW-mo/yr
$256,700
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,370 $4,766 $1,750
15,912
kWh
$620
-
kW-mo/yr
-
TOTAL RECOMMENDED $68,577 $78,177 $(-124,000.0)
(-1,241,756)
kWh
$(-67,911.0)
-
kW-mo/yr
$260,488
-
MMBtu
TOTAL IMPLEMENTED $66,207 $73,411 $(-125,750.0)
(-1,257,668)
kWh
$(-68,531.0)
-
kW-mo/yr
$260,488
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs