| Assessment Year | 2004 |
|---|---|
| Principal Product | Sand and Gravel |
| NAICS | 212321: Construction Sand and Gravel Mining |
| SIC | 1442: Construction Sand and Gravel |
| Sales Range | $1 M to 5M |
| # of Employees | 30 |
| Plant Area |
1,000,000
ft2
|
| Annual Production | 2,500,000
ton
|
| Production Hrs. Annual | 5,060
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $124,410 | 1,941,900 |
kWh
|
$0.064 |
| Electricity Demand | $21,360 | 10,680 |
kW-mo/yr
|
$2.00 |
| Other Gas | $260,259 | 27,610 |
MMBtu
|
$9.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $90,510 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,855 | $60 | n/a |
$4,521
70,444
kWh
|
$334
-
kW-mo/yr
|
- | - | - | - |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $771 | $18 | n/a |
$718
11,195
kWh
|
$53
-
kW-mo/yr
|
- | - | - | - |
| 03 | 4.445: Install equipment to move product | $32,901 | $159,000 | n/a |
$(-303,336.0)
(-4,726,392)
kWh
|
$(-22,416.0)
-
kW-mo/yr
|
- |
$182,160
-
MMBtu
|
$176,493 | - |
| 04 | 2.4134: Replace electric motor with fossil fuel engine | $49,440 | $190,300 | n/a |
$79,778
1,243,042
kWh
|
$5,896
-
kW-mo/yr
|
$(-36,234.0)
-
MMBtu
|
- | - | - |
| 05 | 2.4133: Use most efficient type of electric motors | $1,661 | $1,885 | n/a |
$1,547
24,106
kWh
|
$114
-
kW-mo/yr
|
- | - | - | - |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $882 | $3,715 | n/a |
$796
12,401
kWh
|
$72
-
kW-mo/yr
|
- | - | - | $14 |
| TOTAL RECOMMENDED | $90,510 | $354,978 |
$(-215,976.0)
(-3,365,204)
kWh
|
$(-15,947.0)
-
kW-mo/yr
|
$(-36,234.0)
-
MMBtu
|
$182,160
-
MMBtu
|
$176,493 | $14 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs