ITAC Assessment: AS0379
ITAC logo
ITAC Assessment: AS0379
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Sand and Gravel
NAICS 212321: Construction Sand and Gravel Mining
SIC 1442: Construction Sand and Gravel
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 1,000,000
ft2
Annual Production 2,500,000
ton
Production Hrs. Annual 5,060
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,410 1,941,900
kWh
Electricity Demand $21,360 10,680
kW-mo/yr
Other Gas $260,259 27,610
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,510 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,855 $60 n/a $4,521
70,444
kWh
$334
-
kW-mo/yr
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $771 $18 n/a $718
11,195
kWh
$53
-
kW-mo/yr
- - - -
03 4.445: Install equipment to move product $32,901 $159,000 n/a $(-303,336.0)
(-4,726,392)
kWh
$(-22,416.0)
-
kW-mo/yr
- $182,160
-
MMBtu
$176,493 -
04 2.4134: Replace electric motor with fossil fuel engine $49,440 $190,300 n/a $79,778
1,243,042
kWh
$5,896
-
kW-mo/yr
$(-36,234.0)
-
MMBtu
- - -
05 2.4133: Use most efficient type of electric motors $1,661 $1,885 n/a $1,547
24,106
kWh
$114
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $882 $3,715 n/a $796
12,401
kWh
$72
-
kW-mo/yr
- - - $14
TOTAL RECOMMENDED $90,510 $354,978 $(-215,976.0)
(-3,365,204)
kWh
$(-15,947.0)
-
kW-mo/yr
$(-36,234.0)
-
MMBtu
$182,160
-
MMBtu
$176,493 $14
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs