ITAC Assessment: KU0487
ITAC logo
ITAC Assessment: KU0487
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product flour and baking mix
NAICS
n/a
SIC 2041: Flour and Other Grain Mill Products
Sales Range $50
M
to 100
M
# of Employees 208
Plant Area
n/a
Annual Production 700,000,000
lb
Production Hrs. Annual 6,720
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,416,532 40,675,264
kWh
Electricity Demand $587,107 86,350
kW-mo/yr
Natural Gas $139,711 27,954
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $267,920 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $208,050

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $145,460 $342,690 $110,680
3,199,883
kWh
$34,780
-
kW-mo/yr
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $35,550 $25,230 $11,650
336,753
kWh
$4,410
-
kW-mo/yr
- - - $19,490 -
03 3.5315: Lease / purchase baler; sell cardboard to recycler $46,010 $21,000 - - - - $55,830
-
lb
$(-9,820.0) -
04 3.4155: Meter waste water $6,380 $520 - - $6,380
-
Tgal
- - - -
05 3.8132: Use less toxic and volatile solvent substitutes $7,480 $6,150 - - - $5,440
-
gal
- $2,040 -
06 4.611: Begin a practice of predictive / preventative maintenance $27,040 $6,400 - - - - - - $27,040
TOTAL RECOMMENDED $267,920 $401,990 $122,330
3,536,636
kWh
$39,190
-
kW-mo/yr
$6,380
-
Tgal
$5,440
-
gal
$55,830
-
lb
$11,710 $27,040
TOTAL IMPLEMENTED $208,050 $374,320 $122,330
3,536,636
kWh
$39,190
-
kW-mo/yr
- - - $19,490 $27,040
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs