Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Aeorspace Filtration
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area 90,000
ft2
Annual Production 76,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,048 1,925,687
kWh
Electricity Fees $2,892 -
Natural Gas $102,130 8,327
MMBtu
TOTAL YEARLY COSTS $245,070
RECOMMENDED SAVINGS* $8,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $278 $400 $278
3,803
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,040 $7,085 $5,040
69,048
kWh
-
03 2.2437: Recover waste heat from equipment $2,983 $2,000 - $2,983
-
MMBtu
04 2.6211: Conserve energy by efficient use of vending machines $199 $360 $199
2,722
kWh
-
TOTAL RECOMMENDED $8,500 $9,845 $5,517
75,573
kWh
$2,983
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs