Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

115

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sand and gravel
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0781 #04 Y:2023 Use or replace with energy efficient substitutes $486,797 $4,030,000
OR0781 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $618 $2,576
OR0781 #02 Y:2023 Optimize plant power factor $3,665 $20,839
OR0781 #01 Y:2023 Eliminate/reduce an operation $112,997 $116,429
TT0238 #08 Y:2020 Turn off equipment when not in use $511 $40
TT0238 #07 Y:2020 Install / repair insulation on steam lines $1,527 $350
TT0238 #06 Y:2020 Use optimum size and capacity equipment $6,836 $1,500
TT0238 #05 Y:2020 Increase efficiency of trucks $7,291 $24,565
TT0238 #04 Y:2020 Utilize energy-efficient belts and other improved mechanisms $10,965 $22,780
TT0238 #03 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $13,222 $25,000
TT0238 #02 Y:2020 Utilize higher efficiency lamps and/or ballasts $19,091 $75,890
TT0238 #01 Y:2020 Reduce combustion air flow to optimum $28,385 $3,500
OR0730 #05 Y:2019 Utilize higher efficiency lamps and/or ballasts $1,030 $2,058
OR0730 #04 Y:2019 Optimize plant power factor $2,657 $9,364
OR0730 #03 Y:2019 Utilize energy-efficient belts and other improved mechanisms $2,201 -
OR0730 #02 Y:2019 Modify workload $13,223 $18,824
OR0730 #01 Y:2019 Optimize production lot sizes and inventories $15,651 $5,000
WM0138 #07 Y:2019 Make a practice of turning off lights when not needed $4,770 -
WM0138 #06 Y:2019 Utilize energy-efficient belts and other improved mechanisms $6,375 $11,900
WM0138 #05 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $9,068 $14,525